线缆CPR认证

CABLE CPR CERTIFICATION

中文版  |  ENGLISH

+86 25 8658 3475

Contact

  • TEL: +86 25 8658 3475
  • FAX:+86 25-8658 3457
  • Email:info@fire-test.com
  • Website:www.cprce.com
  • Address:16F, Deying Mansion, No.118 Middle Jiangdong Road, Nanjing 210012, China
Current Location:HOME > NewsCenter > Regulations
Regulations

AS 42541.1/AS 4254.2 Ductwork Testing to Australian Standards

From:CABLE CPR CERTIFICATION  Clicks:494  Time:2023-12-6
The Australian National Construction Code contains the deemed to satisfy requirements for fire in Volume 1 Specification C1.10. This requires flexible and rigid ducting to be complying with AS 4254AS 4254 ductwork for air-handling systems in buildings has two parts:

1. AS 4254.1 - Flexible Ducting 

    AS 4254.1:2021 Ductwork for air-handling systems in buildings, Part 1: Flexible duct




2. AS 4254.2 - Rigid Ducting
    AS 4254.2:2012 Ductwork for air-handling systems in buildings, Part 2: Rigid duct.

Amongst other physical tests, ducting used for air handling systems must comply with the requirements of two flammability tests. 

AWTA Product Testing - Capabilities AWTA Product Testing has many years of experience in testing to both AS/NZS 1530.3 and UL 181, both of which are required by AS 4254.1-2012 and AS 4254.2-2012. AWTA Product Testing is NATA accredited for both of these tests.

Additionally, we can carry out the mechanical performance tests in AS 4254.1, for which we are NATA accredited. 

For more information Please follow the below link for more information on ductwork testing.

Tel: (+86) 25 8658 3475  or  Email: info@fire-test.com  
Website: www.fire-test.com  www.firete.com 
wechat: firetesting  or  17714189018

...

TEL:
+86 25 8658 3475